PLAIN & BROOM FINISH CONCRETING
Straight concreting, done the boring way — which is the right way. Proper base preparation, proper steel, proper cover, proper cure, and control joints cut where they belong so the slab cracks where we tell it to instead of where it wants to.
Broom finish for grip on a slope, steel float where it is going under cover. Either way you get a slab you can build on and then forget about.
- Best for
- Slabs, paths, crossovers
- Before driving
- 7 days
- Warranty
- In writing, every job
What you get
DONE PROPERLY, START TO FINISH
Most of the concrete failures we get called out to were decided before the truck arrived: no compaction, mesh sitting on the dirt, or joints cut a week late. None of that costs much to do properly.
- +Excavation, base course and compaction to the right depth
- +Mesh and bar to engineer’s detail where required
- +Broom, steel float or wood float finish
- +Control joints saw-cut on time, not when someone gets around to it
- +Cured properly instead of left to bake in the sun
How the job runs
4 STAGES, WRITTEN INTO YOUR QUOTE
-
01
Base & formwork
Excavate, compact, set levels and falls so water runs where you want it.
-
02
Steel & mesh
Mesh on chairs at the right cover — never pulled up off the ground mid-pour.
-
03
Pour & finish
Screed, float and broom or steel trowel to the finish you asked for.
-
04
Cut & cure
Control joints saw-cut on time, then cured instead of left to bake.
Finishes and patterns
REAL JOBS, REAL FINISHES
Straight answers
PLAIN & BROOM FINISH QUESTIONS
The questions we get asked on the driveway about this one. Anything else, ring us — you will get a person.
ASK US — 0404 859 045
How thick should a concrete driveway be?
A residential driveway is normally 100mm on a compacted base with SL72 mesh. Where trucks or caravans track over it we thicken to 125–150mm and add bar. We will spec yours when we quote it.
Do I need council approval for a crossover?
For the section between the kerb and your boundary, yes — councils have their own profiles and want to inspect it. We build to spec and leave it inspection-ready.
Will my new concrete crack?
Concrete shrinks, so it moves. The job of the control joints is to decide where. Cut on time and at the right spacing, the slab cracks along a straight line you can barely see.