DECORATIVE CONCRETE RESURFACING
A spray-on or stencilled overlay laid straight over the slab you have already got. You pick the pattern — slate, ashlar, brick, tile — and the colour, and a tired grey driveway comes back looking like it was poured that way.
The finish is only ever as good as what sits under it. We diamond-grind the whole surface, cut out and fill every crack, prime it, then build the overlay and seal it. That is why ours does not lift after two wet summers.
- Best for
- Driveways, patios, paths
- On site
- 2–3 days
- Lasts
- 15–20 years
What you get
DONE PROPERLY, START TO FINISH
It is the cheapest way to change how the front of a house reads. A third to a half the cost of a rip-out and re-pour, finished in days instead of weeks, with no excavator on your lawn.
- +Slate, ashlar, brick, tile and custom stencil patterns
- +Colour chosen off real samples in your own light
- +Full diamond grind, crack cut-out and primer before the overlay
- +Two seal coats, non-slip additive where it is wanted
- +Written workmanship warranty on every job
How the job runs
4 STAGES, WRITTEN INTO YOUR QUOTE
-
01
Grind & repair
Diamond grind the whole surface, cut out cracks, patch spalling, wash and mask.
-
02
Base coat
Bonding primer, then base coat sprayed or trowelled to an even build. Stencils set out.
-
03
Pattern & colour
Pattern laid, colour coats applied, edges cut in clean, stencil lifted.
-
04
Seal
Two coats of sealer with non-slip where needed, then a walk-around with you.
Finishes and patterns
REAL JOBS, REAL FINISHES
Straight answers
DECORATIVE RESURFACING QUESTIONS
The questions we get asked on the driveway about this one. Anything else, ring us — you will get a person.
ASK US — 0404 859 045
How long does decorative concrete resurfacing last?
Done properly, 15 to 20 years and more. The decorative layer is not the weak point — the preparation underneath it is. Re-seal every 3 to 5 years and a resurfaced driveway will outlast the fence.
Can you resurface cracked concrete?
Nearly always. Hairline, shrinkage and settlement cracks get cut out, filled and stitched first. If the slab is heaving or has broken into pieces that move independently, we will tell you straight — that one needs replacing.
How soon can I drive on it?
Foot traffic after about 24 hours, cars back on after 5 to 7 days depending on weather. Keep turning wheels off it for the first fortnight.
Related
OFTEN QUOTED TOGETHER
POOL SURROUND RESURFACING
Non-slip, cool underfoot
Read more + 06CRACKS, SPALLING & CONCRETE REPAIRS
Cut out, fix the cause, hide it
Read more + 09CONCRETE SEALING & RE-SEALING
Two coats, every 3–5 years
Read more + GUIDERESURFACING VS PAVERS
Cost, lifespan and what fails first
Read the guide + GUIDEPATTERNS & COLOURS
Every finish we lay, and where it suits
Read the guide +FREE ON-SITE QUOTE. NO OBLIGATION.
Tell us what you have got and we will come and measure it. You get a written, itemised price with a start date on it — not a number over the phone that changes when we turn up.